A fully accessible community building on the boundary of the Kings Cross masterplan with an innovative timber structure.Haptic GreenLivePlayTimberUKWork

Qualify

Conceive

Refine

Realise

Won in competition in 2017, this project was selected by client Argent for its sustainable yet tactile design.

The building sits within W-zone on the edge of the Kings Cross regeneration area, straddling the line between the boroughs of Camden and Islington.

Described as ‘one of the final pieces of the puzzle’ in the Kings Cross project – one of Europe’s largest regeneration initiatives – the W3 scheme will help to soften the boundary between the masterplan and the older neighbourhoods beyond.

Our brief was to create a community building that would be fully accessible to all of its neighbours, with a mix of uses including a café, gym studios and a creche.

W3 is a community building, targeted to achieve a BREEAM excellent rating for its environmental performance, with a structure and facades all made from engineered timber.

It sits between two new green spaces, so has been designed to integrated seamlessly with these. The ground floor is open and transparent, with movable screens and a concertina wall opening onto the adjoining gardens.

Inside there will be space for members of the community to learn, exercise and socialise. The café is earmarked for use by Global Generation, a charity focusing on growing food and creating habitats for urban wildlife.

Through a combination of sustainably sourced materials, passive design features, highly efficient building services and a centralised energy supply, W3 will have a very low carbon footprint, both in construction and in use.

A green roof, with a mix of bird and bat boxes, will contribute to the area’s biodiversity.

No vehicle car parking spaces are included in the design. Instead, the garden will have up to 108 spaces for cycle parking.